Hey,
i have a funnel question for you guys.
I want to measure the conversion time from event A to event B.
Event A can be thrown multiple times before event B occurs.
How can i make sure that the conversion time is calculated from the last time event A occured until first time event B occured (event B occurs only once anyway) ?
Thanks a lot in advance :gratitude-thank-you:
so yeah. generating a different event. Its not an elegant solution, but it seems that there is no way through the UI, you DO have the first time, but last time